Construction progress

Status of works
Dismantling of the bowl of the cooling pool and the exit of the basement ventilation shaft has started. Means for loading garbage into trucks have been installed, elevator equipment has been dismantled by 90%, and the internal elements of a three-story stylobate in the yard are being actively dismantled. The dismantling of the protective reinforced concrete covering of the stylobate roof has begun, the structures for fastening the concrete slabs of the building facade have been exposed to assess the complexity of the work. Dismantling works of internal furnish, engineering networks, partitions are carried out. Construction garbage is being removed.
Web cameras
  • Putting into operation
    4 quarter 2024
Construction
Facade
Landscaping
Networks
June
2 photo
June
2 photo
May
3 photo
March
2 photo
SEO текст для зразку
Итальянские дизайнеры, с которыми мы сотрудничаем, разработали четыре ключевых направления, которые будут использоваться в оформлении апартаментов. В своих проектах они вдохновлялись творчеством всемирно известных художников. Часть из них тесно связана с Украиной. Это Василий Кандинский, Казимир Малевич и Энди Уорхол. Мы позаботились о том, чтобы избавить жителей SAGA City Space от лишних хлопот. Именно